Calculator preliminar

Generator calculator

Estimate running kVA, reserve-adjusted demand, and a preliminary generator size that also considers the largest motor-start event.

Assumptions used by this calculator

  • Running kVA is estimated from running kW and power factor.
  • Largest motor start allowance uses a simplified multiplier based on starting method.
  • Use this as a planning figure only. Final generator selection still requires transient, harmonic, and manufacturer-specific review.

Running demand

211.76 kVA

Estimated apparent power based on configured steady-state load and power factor.

Reserve-adjusted demand

254.12 kVA

Running demand after applying the configured operating reserve.

Motor-start allowance

135 kVA

Simplified additional allowance for the largest motor-start event.

Recommended generator

400 kVA

Rounded preliminary generator rating from the governing running or start case.